Executed heavy-lift project cargo transport for a 660MW power plant equipment from JNPT to Gujarat, including oversized loads and specialized handling.

Project Overview

FreightSol was entrusted with the transportation of critical power plant equipment for Adanis 660MW thermal power project. The cargo included oversized transformers, boiler components, and turbine assemblies weighing up to 120 tonnes each.

Key Highlights

  • Transported 45 heavy-lift consignments over 8 months
  • Max single piece weight: 120 metric tonnes
  • Route survey and permits for oversize cargo
  • Hydraulic axle trailers and crane arrangements
  • End-to-end insurance coverage managed

Results

All equipment was delivered to the project site without damage or delay. The power plant commenced operations on schedule, with FreightSol managing the complete logistics chain from port to site.